Ⅰ. The design of the pool of the water park project should meet the following requirements


1. The water park project pool should be designed for waterproofing, and technical measures should be taken to avoid sinking, water leakage, cracking and other problems in the pool;


2. The pool body should be equipped with climbing ladders, and the climbing interval should not be greater than 15.0m;


3. Clear and visible water depth signs should be set on the pool wall of the water park project;


4. Anti-collision measures should be taken on the wall of the tsunami pools;


5. A full-length footrest should be set at 1.20m below the water surface of the pool wall, and the width should not be less than 0.15m;


6. An overflow trough should be set on the pool wall, and an overflow grate should be set on the trough; when the overflow trough is used as overflow backwater, it should not be discharged into the dirty water of the pool bank.


7. A lifeguard safety observatory should be set up for every 100 square meters of water surface area, and the height of the safety observatory from the pool bank floor should not be less than 1.20m. The safety observatory should be able to observe the entire recreational water area;


8. The water park project pool should be equipped with emergency drainage facilities. And the drain should take measures to prevent children from inhaling;


9. The edge of the pool should be set to prevent the surrounding rainwater, sewage, etc. from flowing into the pool;


10. The width of the pool bank should not be less than 7.0m, and the angle between the pool bank and the pool body should be rounded;


11. The ground surface material of the pool bank should be non-slip and easy to clean, and a drainage slope should be set.


Ⅱ. Calculation of the number of people in the water park project


1. The maximum number of people in the pool area of the water park project at the same time is calculated as 0.5 people/m.


2. The number of people in the vehicle area should be calculated based on the passenger capacity of the water park equipment.


Ⅲ. Housing and facilities of the water park project


The auxiliary rooms and facilities of the water park project shall comply with the relevant provisions of the current national standards and shall meet the following requirements:


1. The number of changing clothes, showers, toilets and sanitary wares should be determined according to the number of people who should be in accordance with the rated passenger capacity of the amusement pool of the water park project;


2. Before entering the recreational water area, it is mandatory to pass through sanitary facilities such as showers and disinfecting foot baths. The width of the disinfection foot bath should be the same width as the passage leading to the pool, the length of the disinfection foot bath should not be less than 2.0m, and the depth should not be less than 0.20m;


3. Anti-slip measures should be taken on the ground in wet spaces such as walkways, changing rooms, bathrooms and toilets;


4. The technical equipment room of the water park project should include water treatment room, water quality inspection room, water pump room, power distribution room, etc., as well as related computer rooms and warehouses;


5. When using liquid chlorine and other chemicals for water treatment, there should be an independent chlorination room and chemical storage room;


6. Technical measures such as fire prevention, explosion prevention and ventilation shall be adopted in the chlorination room and chemical storage room.


Related News
  • Four Main Points of Water Park Design

    Four Main Points of Water Park Design

    July 6, 20171. Site selection and size should be carefulWater park location should be convenient in the traffic, the park is not the bigger the better, its size according to the local traffic can be achieved, the...view
  • Making a Splash with the Best Water Park Equipment

    Making a Splash with the Best Water Park Equipment

    February 23, 2023IntroductionWater parks are a favorite summer destination for families, thrill-seekers, and water enthusiasts alike. Whether you're looking for a leisurely float down a lazy river or an adrenaline-pum...view
  • Space Bowl Water World

    Space Bowl Water World

    August 20, 2018The space bowl water world with a high-speed drop through a tube is always popular, riders are launched into the bowl the place centrifugal forces keep riders high on the wall for countless rotations....view
  • Design for quality water park

    Design for quality water park

    April 4, 2019Park planningBefore starting the construction of water parks, we should first look for water park equipment manufacturers to do planning scheme, and then arrange the equipments of the water park legit...view
  • Maintenance of Fiberglass Water Slides

    Maintenance of Fiberglass Water Slides

    July 29, 2019Composite materials are commonly used in commercial fiberglass water slides. The so-called composite material refers to a new type of material composed of glass fiber and resin. Water slide is immerse...view
  • What are the requirements for water park construction?

    What are the requirements for water park construction?

    April 24, 20181. The location and scale of water park construction is very important.The location of water park should be convenient for transportation, and the scale should be based on the local traffic flow, cons...view
Home
Home
About Us
About Us
Products
Products
Water Park Project
Project
News
News
Contact Us
Contact Us