Guangzhou Haisan Amusement Technology Co., Ltd.
Guangzhou Haisan Amusement Technology Co., Ltd.
Email Us
Tips To Build a Hotel Waterpark

Tips To Build a Hotel Waterpark

Want to Build a Hotel Waterpark Resort? Here are some tips:
First, get a market analysis and feasibility study done. Ask an independent consultant to quantify the demand in your area and specify the size of your indoor waterpark. Sizing your waterpark must be done in relation to the size of your hotel, area demographics and the preferences of the potential guests within 200 miles of your hotel.

Using your feasibility report, determine a tentative footprint for your indoor waterpark, let’s say 30,000 square feet. Give this footprint to a pool designer and a waterslide manufacturer-Such as Haisan-the leading water park equipment manufacturer in China.Along with the report recommendations and list of features, such as slides, water house, rocks, pools, spas, lazy river, wave pool, mushrooms and

Ask the designer to read the feasibility report regarding the target market and recommend some design and theming concepts.

Ask the waterslide manufacturer’s engineers to work with designer to
(1)determine where slides will end and start,
(2) design the slide radiuses and descents that are acceptable
(3) determine the final footprint of your building.

Indoor waterparks are much more than a pool with a slide. They include many complex systems that must be integrated to provide the highest possible entertainment value.

Related News
  • Do not ignore water park maintenance

    Do not ignore water park maintenance

    September 7, 2017In order to extend the life of the water park equipment and increase the quality of the water park equipment, in the process of water park equipment management, the staff should use and maintain the e...view
  • Water park equipment investment decision making

    Water park equipment investment decision making

    March 20, 20191. Scientific planning for site selection The location should be based on the project traffic location, the local population of the 1-2 hour economic circle market, the per capita consumption level, and competitors. In the same market area, homogenizatioview
  • Why Should Water Amusement Park Equipment Be Updated Regularly?

    Why Should Water Amusement Park Equipment Be Updated Regularly?

    February 18, 2021Ⅰ. How long is the service life of the water park equipment?This is a question that every investor will consider when investing in water parks and choosing water park equipment. This depends on the m...view
  • What are the Design Ideas for the Aqua Park?

    What are the Design Ideas for the Aqua Park?

    December 14, 2020The design ideas for the aqua park are as follows:1. Aqua park project planning principles(1) Focus on ecological protectionAs the right time and place are important, the aqua park displays the harmon...view
  • Materials for Surf Pools to Choose From

    Materials for Surf Pools to Choose From

    April 21, 2020With the frequent use of the surf pool in recent years, many problems have emerged. Thus, the covering material of the surf pool has aroused attention. Improper material used is tend to lay potential ...view
  • Trends of New Type Amusement Theme Parks

    Trends of New Type Amusement Theme Parks

    July 6, 2017With the demands of tourists and technical chances, new type of amusement theme parks comes to a brand-new stage, and developed into a fully innovative developing platform. According to the developing...view
Home
Home
About Us
About Us
Products
Products
Water Park Project
Project
News
News
Contact Us
Contact Us