With the arrival of the holiday economy, more and more cultural tourism complex will be invested. How to create attractive experience content has become a thorny problem in the project. Cultural tourism project investment is huge, linked, a wrong move may cause the overall passive, especially in recent years, a large number of new cultural tourism complex, urgent need of high-quality content filling. Like in water parks, the different theme for water slides will make them special and substituted.

1. Generally speaking, the content of play is more substantial and novel, which can support more than half a day of play time. The current pricing is acceptable for large city consumers. This type of indoor theme park is valuable for many scenic spots or cultural tourism complex with poor content.           

2. Modularity is a major feature of indoor theme park. If a mature and complete product system is formed, it can be rapidly expanded and copied. After the formation of large-scale chain operation, the high cost of content production and authorization can be diluted, and the entertainment equipment of each store through the network collaborative interaction is also a very mature technology at present.           

3. This project can be regarded as a good example of the combination of IP and entertainment. Many large and medium-sized entertainment projects have the support of world-famous IP, which can get a lot of benefits in project attraction, publicity and play experience. In addition, it also synchronously promotes the popularity of Huaxia animation's own IP "Ziyan".           

4. Accommodate far less tourists than the publicity and expectation of the project party. Each large and medium-sized entertainment project (not included in the arcade) can only support about 100 people to play at the same time in total. If the number of people exceeds this number, the queuing time will be greatly increased, and the sense of experience will be much worse. For the indoor theme park of this volume, the capacity is obviously low. If we design some amusement projects that can accommodate more tourists to experience at the same time, and the rhythm is fast, it will greatly improve the carrying capacity of the project tourists.           

5. As a high-tech experience oriented indoor amusement park, the content is kingcraft, and visitors must experience unique and irreplaceable fun here. There are still some traditional amusement projects, or the technology content is insufficient, and such equipment and arcades occupy a lot of valuable indoor area. If the function of an on-site device is similar to that of a tourist's mobile app, what's the interest? The rapid progress of VR, AR, holography and other technologies gives the project a lot of space to play.            

6. With Sega player's arena's lessons, it's not difficult to have good earnings in the early stage of opening, but to maintain the attraction to the customer group for several years, strive for secondary consumption and obtain good earnings, it's very important to update the amusement projects iteratively in the future.

water slide


Related News
  • Four Key Points of Water Park Slide Design

    Four Key Points of Water Park Slide Design

    April 26, 20191. Careful site selection and scale ​The location of water park should be conveniently located. The size of water park slide should be determined by the local realizable passenger flow, consumption level and self-management team. It should noview
  • Water park management data analysis is the top priority

    Water park management data analysis is the top priority

    April 15, 2021Water park management data analysis is the top priority 1. Analyze event planning and operation data. 2. Analyze content operation data. 3. Analyze project operation data.view
  • Two recommendations for water park investment

    Two recommendations for water park investment

    February 24, 2020Two recommendations for water park investment Summer is the peak season for water parks. Many investors have great investment interest in this project. What factors should be considered when investing in water park projects? How to choose a suitable wview
  • An Analysis of China's Water Park Issues - part one

    An Analysis of China's Water Park Issues - part one

    April 9, 2020The time has come to the second decade of the 21st century. Looking back at the first decade of this century, everyone who is familiar with the domestic amusement industry knows that this is a decade of rapid development of the Chinese amusement industry.view
  • Haisan water slide company has the Strongest Production Capacity

    Haisan water slide company has the Strongest Production Capacity

    July 7, 2017Haisan water slide company has the strongest R & D and production capacity. Haisan Amusement Technology is the first company specialized in the planning and designing, R & D, installation, landscape design and construction, and management of water amusemview
  • strategy management of building water park

    strategy management of building water park

    September 7, 2020The rule of the weekend is very obvious.The residents in the surrounding areas are the main tourists on weekends. Atthis time (usually on weekends), the number of tourists on Saturdays isobviously the...view
Home
Home
About Us
About Us
Products
Products
Water Park Project
Project
News
News
Contact Us
Contact Us