Basic process of water park construction

After obtaining the land use right and project approval, carry out:           

(1) Conceptual design planning stage           

1. Select the concept design unit to carry out the docking of the concept design work;            2. Creative theme, story line theme image equipment list floor layout, overall aerial view, equipment outsourcing style, etc.           

(2) Selection stage of water amusement facilities           

1. Select and purchase equipment according to the equipment list provided by conceptual design, and determine the equipment production cycle;           

2. Determine equipment location, floor area and foundation drawings.           

(3) Planning and design stage of water park            

Scheme water parks design:           

1. Interior packaging design of each partition plan, general plan, visitor moving line, traffic route and evacuation route;           

2. Interior landscape design, interior landscape props style design, assist tool props design;          

3. Lighting system design.           

Expansion design indoor packaging design:           

1. Interior landscape design;           

2. Environment art and scene props;           

3. Equipment packaging design;            

4. Lighting system design.           

Construction design:           

Including interior packaging design, landscape design, environmental art and scene props, equipment supporting packaging design, lighting system design, logo system design theme, logo design function logo, etc.

Civil construction stage

According to the planning drawings of the water park, pay special attention to the location of embedded parts, water inlet and outlet, load-bearing structure, etc.

Equipment installation and commissioning           

1. Registration and filing of quality supervision department;           

2. Equipment installation, equipment installation and commissioning;           

3. Amusement equipment acceptance certificate;           

4. Equipment maintenance and operation training.

Recruitment, establishment and training of operation team

1. Establishment of operation management system;           

2. Recruit core management and equipment maintenance personnel before equipment installation and commissioning;           

3. At the later stage of water park equipment installation and commissioning, the amusement equipment operators are in place;           

4. Service etiquette, process training and safety management training;           

5. Operation, maintenance and management personnel obtain corresponding certificates;           

6. Basic knowledge training of amusement equipment, operation emergency drill training, simulation and practical operation training of each post.

Trial operations

1. Employees are familiar with their own work process and service process;           

2. Collect feedback from tourists and upgrade;           

3. In the operation, we found the deficiencies and optimized the process;           

4. Troubleshooting and rectification of potential safety hazards.

Grand Opening

1. Prophase publicity;           

2. Activity arrangement;           

3. Passenger flow safety control;           

4. Crisis public relations drill;           

5. Safety emergency plan;           

6. Preferential policies for opening;           

7. Equipment maintenance and update.           

The preparation and construction of water park is not a simple project preparation and construction, but a process of overall planning, operation and management of the project as a whole.



Related News
  • Iteration and innovation of parent-child leisure-2

    Iteration and innovation of parent-child leisure-2

    April 30, 2020Many theme parks(including water slide) are naturally rich in parent-child elements, such as foreign Disneyland, Lego Park, etc., as well as domestic Fonterra, Chimelong, etc. their product target customers tend to be younger and family, the content of whview
  • Safety first: precautions for the preparation and operation of water park equipment-part two

    Safety first: precautions for the preparation and operation of water park equipment-part two

    November 4, 201911, indoor venues import and export design needs? (1) Indoor venues with large carrying capacity, in order to increase the rapid entry of tourists into indoor venues, 2-3 corridors are generally designed to save time for entering indoor water park equiview
  • Happy water slide equipment in Greenery Water Park Kyao Yai

    Happy water slide equipment in Greenery Water Park Kyao Yai

    February 25, 2017Greenery Splash world is a newly opened water park in Khao Yai. , With many water slide equipment, we took our kids aged 11 and 8 and we all loved the park. We have been to quite a few water Parks in the region Singapore, Phuket, and this one at Khao Yaiview
  • What is the principle of the water park design?

    What is the principle of the water park design?

    October 17, 2019Water park design, construction and operation of slides are highly consistent with park investors, managers and visitors. First of all, safety is always in the first place. As a special facility, it must be certified by the competent national authoritiview
  • Water park construction period

    Water park construction period

    July 17, 2020If we do not consider the time for investor’s approvalprocedures and if civil engineering and water slide equipment production start at the sametime, the construction period of the water park project...view
  • How to play the night economy in theme water park equipment - part one

    How to play the night economy in theme water park equipment - part one

    October 11, 2019The Connotation and Significance of Night Travel Economy Night economy is an economic concept put forward by the United Kingdom in 1970s to improve the phenomenon of empty nest at night in urban centres. It refers to the modern urban consumption whichview
Home
Home
About Us
About Us
Products
Products
Water Park Project
Project
News
News
Contact Us
Contact Us