Related News

Design of moving line of parking lot and entrance-3
April 1, 2020For the more common parking lot, the ground should be hardened and set according to the relevant specifications; it is suggested to set sidewalks on the side, with a certain height difference from the parking lot ground.view
What are the Advantages of Water treatment Equipment?
July 7, 2017First, strong bactericidal capacity.When water enters the device fully contact with the oxygen, it volatile ammonia and nitrogen (Elements of urea) harmful gas. Then through mix he gas and water, enha...view
Water park equipment manufacturer: How long does it take to build a water park?
November 20, 2020The water park is basically divided into two parts, one is the civil engineering part, and the other is the water park equipment manufacturing and installation.view
Water park planning and design suggestions from HAISAN water slide company
March 13, 2019The design and design of the water park is comprehensive. In order to cope with some problems that are common in the current market from water slide company and avoid repeating the mistakes and achieve the sustainable development of the water park, the foview
Ten development trend of water parks-Analysis from Chimelong Water Park and Universal Studios Volcano Bay Water Park - Trend four
February 12, 2019The fourth trend is not only entertainment, but also leisure. We generally understand that visitors to the water park are entertaining, play one project and then another project, then go on to the next project, play for a few hours a day, play enough, theview
Water Park Project in Vietnam is Under Construction Now
September 22, 2017The construction team in our water park project in Can Tho city, Vietnam installs the big water slide - Tantrum Alley slide now. The slide contains three small trumpets (3.6m to 7.42m), the tower heig...view
English
Chinese
français
Español
русский
português
العربية
tiếng việt
ไทย
Pilipino
Indonesia
Afrikaans
info@gzhaisan.com
+86 13527814016
+86 13527814016
